Restored archive. The original History Commons is no longer online; this is a read-only edition of its timelines. Content is licensed CC BY-NC-SA.

November 8, 2004: Army Corps of Engineers Releases Final Reports on Louisiana Coastal Area (LCA) Restoration Study

2004-11-08

The US Army Corps of Engineers releases its final report and programmatic environmental impact statement on the Louisiana Coastal Area (LCA) Ecosystem Restoration Study. The plan would cost $1.9 billion and take ten years to implement. The Corps recommends a 65-35 federal-state cost-sharing formula, with the federal government contributing $1.28 billion, and the Louisiana Department of Natural Resources paying the rest. The comment period will end on December 6, after which point a Chief of Engineers report will be completed and provided to the Secretary of the Army for review and submission to Congress. [Philadelphia Inquirer, 10/8/2004; US Army Corp of Engineers, 11/8/2004; Louisiana Coastal Area Study, 11/8/2004] The LCA ecosystem restoration plan contains several components:
Near-Term Critical Restoration Features - “The recommended plan includes a number of critical restoration projects, five of which are recommended for near-term continued study, design, and implementation. These five projects address the most critical ecological needs of the coastal area and address a range of effects essential for success in restoring the coast. The five near-term critical restoration features are (1) Mississippi River Gulf Outlet Environmental Restoration Features; (2) Small Diversion at Hope Canal; (3) Barataria Basin Barrier Shoreline Restoration, Caminada Headland, Shell Island; (4) Small Bayou Lafourche Reintroduction; and (5) Medium Diversion at Myrtle Grove with Dedicated Dredging.” In addition to these five projects, an additional ten near-term critical restoration features are recommended for study and future congressional authorization. The strategies that the Corps intends to implement in these projects include “(1) Freshwater and sediment re-introductions by diverting some Mississippi River flows into hydrologic basins; (2) Barrier island restoration through placement of sand from offshore sources or the Mississippi River to sustain key geomorphic structures; (3) This would help protect the ecology of estuarine bays and marshes by reducing gulf influences as well as protect nationally important water bird nesting areas; (4) Hydrologic modifications to help restore salinity and marsh inundation patterns and provide fishery access in previously unavailable habitats; and (5) Creating a marsh platform for habitat in areas near existing navigation channels through the beneficial use of maintenance dredging material.” [US Army Corp of Engineers, 11/8/2004; Louisiana Coastal Area Study, 11/8/2004; National Wetlands Research Center, 12/15/2004]
Science and Technology Program - “The major goal of the program would be to decrease scientific and engineering uncertainties of restoration efforts and to optimize restoration opportunities.” [National Wetlands Research Center, 12/15/2004]
Science and Technology Program Demonstration Projects - “The recommended plan includes funding over a 10-year period for demonstration projects to be developed by the Science and Technology Program. These projects will cost a maximum of $25 million each.” [National Wetlands Research Center, 12/15/2004]
Beneficial Use of Dredged Material Program - This program intends to use “dredged material to restore, protect, and create aquatic and wetland habitats in connection with construction or maintenance dredging of an authorized project.” [US Army Corp of Engineers, 11/8/2004; Louisiana Coastal Area Study, 11/8/2004]
Modifications Program - The Corps will investigate how existing structures or their operation management plans can be modified to improve environmental performance. [US Army Corp of Engineers, 11/8/2004; Louisiana Coastal Area Study, 11/8/2004]
Large-Scale and Long-Term Concepts Requiring Detailed Study - This study will “determine their potential for achieving restoration objectives beyond the critical needs, near-term focus of other LCA Plan components.” [US Army Corp of Engineers, 11/8/2004; Louisiana Coastal Area Study, 11/8/2004]